You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Because of the delay (and rescoping) in u18 release, u19 core proposals were excluded from upgrade.go and were tested as core eval submissions in a p:upgrade-19 a3p-integration test. However most of these core proposals were not submitted during the eval.sh phase, and instead were submitted during a test.sh phase, which means the z:acceptance layer was not testing the outcome of the u19 core proposals.
Expected behavior
u19 core proposals running as part of a chain software upgrade (upgrade.go) on top of u18, or if #10839 is not merged yet, making sure they're sent as part of the eval.sh stage.
Platform Environment
CI / a3p-integration
The text was updated successfully, but these errors were encountered:
Describe the bug
Because of the delay (and rescoping) in u18 release, u19 core proposals were excluded from
upgrade.go
and were tested as core eval submissions in ap:upgrade-19
a3p-integration test. However most of these core proposals were not submitted during theeval.sh
phase, and instead were submitted during atest.sh
phase, which means thez:acceptance
layer was not testing the outcome of the u19 core proposals.Expected behavior
u19 core proposals running as part of a chain software upgrade (upgrade.go) on top of u18, or if #10839 is not merged yet, making sure they're sent as part of the
eval.sh
stage.Platform Environment
CI / a3p-integration
The text was updated successfully, but these errors were encountered: