From a00b4de8aab7305e10cfdf9dbfd41867a199ae36 Mon Sep 17 00:00:00 2001 From: Jordan Gilbert Date: Tue, 19 Nov 2024 18:15:37 +0000 Subject: [PATCH] vid intro --- content/page/documentation/brat-capacity-validation.mdx | 2 ++ 1 file changed, 2 insertions(+) diff --git a/content/page/documentation/brat-capacity-validation.mdx b/content/page/documentation/brat-capacity-validation.mdx index 5518452..0438b96 100644 --- a/content/page/documentation/brat-capacity-validation.mdx +++ b/content/page/documentation/brat-capacity-validation.mdx @@ -34,4 +34,6 @@ After creating the collection, you can create a merged project from it. In the ` As soon as a Beaver Activity project and a BRAT project are available for the same HUC8 watershed within your data directory, the BRAT capacity validation tool can be run. In the `riverscapes-tools` repository, open the `BRAT-Workspace` in VSCode. Click on the run and debug tab on the left and then choose `Validate BRAT Capacity` from the drop down on the top left of the screen. Click the green play button to run the tool. When prompted, enter the HUC number for the HUC8 watershed you are working with. The tool will then run and produce plots and statistics that can be used to validate the capacity predictions of the BRAT model. The tool adds a directory called `validation` to the BRAT project directory, which contains the plots and statistics. +The video below demonstrates the steps outlined above: + \ No newline at end of file