Notifications
You must be signed in to change notification settings - Fork 2
/
Copy pathassignAllCostsMultiunit.m
166 lines (158 loc) · 6.45 KB
/
assignAllCostsMultiunit.m
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
%--------------------------------------------------------------%
% File: assignAllCostsMultiunit.m
% Author: Miel Sharf
% Date 05/08/20
%
% Description: Run all combinations of days and building to check if the
% tariffs are beeing correcty applied to all days of operations.
% Plots all combinations. The tariffs are valid for all seasons.
% Saves the tariffs and power demand combinations in a mat file, along with
% a map of the shape (BUILDING, DAY) (columns) and the corresponding linear
% index in the row.
% Also runs Iliya's mapping to save all needed variables in one file
%--------------------------------------------------------------%
function [decided_costs] = assignAllCostsMultiunit(showPlot)
arguments
showPlot (1,1) logical = false %boolean to decide if the plots of tariffs and demands are shown
end
savepath = '..\Data\';
addpath(genpath(savepath));
%%
smooth_demand = 1; % decide to perform or not smoothing on the demand data
smooth_time = 21; %number of steps for smoothing, needs to be odd. 15=3.75min, 21=5.25min
dt = 15;
n_lines = 3600 / dt; %number of time steps in 1h
end_time = 24; %in hours
T = end_time * n_lines; % total number of time steps in a day
BUILDING = [1, 2, 3, 4];
DAY = [1 2 3];
buildingstring = {'Large Hotel', 'Full Service Restaraunt', 'Small Hotel', 'Residential'}; %for plotting
daystring = {'Winter', 'Spring/Autumn', 'Summer'}; %for plotting
transitionPenalty = 0.01;
%% Get all tariff combinations
%[Building; day]
tariff_map = uint8([1, 1, 1, 2, 2, 2, 3, 3, 3, 4, 4, 4; 1, 2, 3, 1, 2, 3, 1, 2, 3, 1, 2, 3]).';
elec_tariff = zeros(T, numel(BUILDING)*numel(DAY));
power_demand = zeros(T, numel(BUILDING)*numel(DAY));
heat_demand = zeros(T, numel(BUILDING)*numel(DAY));
i = 1;
for b = 1:numel(BUILDING)
for d = 1:numel(DAY)
elec_tariff(:, i) = createElectricityTariffProfile(b, d, dt);
[power_demand(:, i), heat_demand(:, i)] = createDemandProfileVector(b, d, dt);
% SMOOTHING
if smooth_demand
power_demand(:, i) = smooth(power_demand(:, i), smooth_time); %select appropriate amount of hours
heat_demand(:, i) = smooth(heat_demand(:, i), smooth_time);
end
i = i + 1;
end
end
%heat_tariff=0.04; %define heat tariff
%% plotting according to building type
if showPlot
t = (1:n_lines * end_time).' ./ n_lines; % what is it?
%Plot tariffs
k = 1;
for i = 1:4 %building
figure(i);
suptitle([buildingstring{i}; {''}; {''}]); %empty chars to get correct spacing
for j = 1:3 %day
subplot(1, 3, j);
plot(t, elec_tariff(:, k));
title(daystring{j});
xlabel('Time (h)');
ylabel('Rate($/kWh)')
k = k + 1;
end
set(gcf, 'Position', get(0, 'Screensize'));
end
%Plot demands
k = 1;
for i = 1:4 %building
figure(i+4);
suptitle([buildingstring{i}; {''}; {''}]); %empty chars to get correct spacing
for j = 1:3 %day
subplot(1, 3, j);
plot(t, power_demand(:, k), t, heat_demand(:, k));
title(daystring{j});
legend('Power Demand', 'Heat Demand');
xlabel('Time (h)');
ylabel('Power(kW)');
k = k + 1;
end
set(gcf, 'Position', get(0, 'Screensize'));
end
end
%% Run Iliya's mapping and save all the variables at once
load('graph_24h.mat', 'g', 'svToStateNumber');
state_from = g.Edges.EndNodes(:, 1);
state_to = g.Edges.EndNodes(:, 2);
%%%
total_nodes = size(svToStateNumber, 1); %smax*(vmax+1)+1
[SV_states, time_from, n_tsteps, from_state_map, to_state_map] = transformAdjacencyMatrix(state_from, state_to, svToStateNumber);
clear A g;
% Load (and optionally rename) mappings
% the file may have different contents (!?), so we rename the variables
load('sv_mappings') %#ok<LOAD>
if ~exist('power_map', 'var')
power_map = PowerSurf; clear PowerSurf
end
if ~exist('heat_map', 'var')
heat_map = PheatSurfExt; clear PheatSurfExt
end
if ~exist('m_dot_f_map', 'var')
m_dot_f_map = FFSurfExt; clear FFSurfExt
end
%% Natural gas parameter
Qr = 49736500; %J/kg
h_env = 3.015e5; %J/kg
h_100 = 3.9748e5; %J/kg
eta_HRU = 0.89;
eta_b = .98;
mair_mf = 17.2 * 1.2;
Ph_mf = eta_HRU * (mair_mf + 1) * ((Qr * eta_b + mair_mf * h_env) / (mair_mf + 1) - h_100) / 3.6e6; %kWh/kg
price_ft3 = [7.74, 8.85, 6.80]; % $/1000ft^3
density_CH4 = 0.68; % kg/m^3
ft3_m3 = power(0.3048, 3);
price_m3 = price_ft3 ./ (1000 * ft3_m3); %price in $/m^3
price_kg_f = price_m3 / density_CH4; % for MGT costs
price_kWh = price_kg_f / Ph_mf; % price in $/kWh, for heat tariff
heat_tariff = price_kWh;
%% Reshape power maps
power_map = [reshape(power_map.', [], 1); 0];
heat_map = [reshape(heat_map.', [], 1); 0];
fuel_map = [reshape(m_dot_f_map.', [], 1); 0];
mdot_fuel_SU = sum(m_dot_f_map(:, 1:end-1)+m_dot_f_map(:, 2:end), 2); % Computes mdot of fuel consumed in startup for all the different max states
% Select right column with the final price
sol_select = [~SV_states(from_state_map, 1) & ~SV_states(to_state_map, 1), ... % Off-off
~SV_states(from_state_map, 1) & SV_states(to_state_map, 1), ... % Start up
~SV_states(to_state_map, 1), ... % Shut down
true(numel(n_tsteps), 1)];% Remaining transitions
[~, sol_select] = max(sol_select, [], 2);
% checks whether an edge corresponds to a change of (s,v). Such transitions
% will be penalized later in assignCostsMultiunit().
is_transition = [zeros(total_nodes,1);...
~(SV_states(from_state_map(total_nodes+1:end-total_nodes),1)== SV_states(to_state_map(total_nodes+1:end-total_nodes),1) &... %checks equality of S values
SV_states(from_state_map(total_nodes+1:end-total_nodes),2)== SV_states(to_state_map(total_nodes+1:end-total_nodes),2));
zeros(total_nodes,1)]; %checks equality of V values
%% Main loop to assign edges
k = 1;
decided_costs = zeros(numel(to_state_map), numel(BUILDING)*numel(DAY)*numel(price_kg_f));
for cost = 1:numel(price_kg_f)
fuel_price = price_kg_f(cost);
for i = 1:numel(BUILDING) * numel(DAY)
decided_costs(:, k) = assignCostsMultiunit(double(dt), fuel_map, mdot_fuel_SU, total_nodes, sol_select, n_tsteps, from_state_map, to_state_map, fuel_price, is_transition,transitionPenalty);
k = k + 1;
end
end
%%
aux = decided_costs;
decided_costs = single(decided_costs);
save([savepath, 'all_data.mat'], 'tariff_map', 'elec_tariff', 'power_demand', ...
'heat_demand', 'SV_states', 'time_from', 'n_tsteps', 'heat_tariff', ...
'from_state_map', 'to_state_map', 'heat_map', 'm_dot_f_map', 'power_map', ...
'price_kg_f', 'decided_costs', 'state_from', 'state_to', 'sol_select');
%g1=digraph(state_from, state_to, decided_costs(:,1));
save([savepath, 'graph_data_all_days.mat'], '-regexp', '[^aux]');
decided_costs = aux;