Simplify CI workflows (DRY) with scripts #115
ci.yml
on: push
General preparations
0s
Distribution archives
14s
Build (Ubuntu 20.04 LTS x86_64, Clang, SDL2)
1m 12s
Build (Windows x86_64, MinGW, GCC)
1m 44s
Build (Wii, devkitPPC)
34s
Build (3DS, devkitARM)
31s
Build (RISC OS, GCCSDK 4.7)
1m 46s
Build (PSP, pspdev)
20s
Build (Ubuntu x86_64, GCC, SDL1.2)
28s
Create Pre-Release
0s
Annotations
9 errors
Distribution archives
Process completed with exit code 1.
|
Build (PSP, pspdev)
Process completed with exit code 127.
|
Build (3DS, devkitARM)
Process completed with exit code 1.
|
Build (Wii, devkitPPC)
Process completed with exit code 1.
|
Build (Ubuntu 20.04 LTS x86_64, Clang, SDL2)
Process completed with exit code 1.
|
Build (RISC OS, GCCSDK 4.7)
Canceling since a higher priority waiting request for 'ci-refs/heads/dev' exists
|
Build (RISC OS, GCCSDK 4.7)
The operation was canceled.
|
Build (Windows x86_64, MinGW, GCC)
Canceling since a higher priority waiting request for 'ci-refs/heads/dev' exists
|
Build (Windows x86_64, MinGW, GCC)
The operation was canceled.
|