Skip to content

A0-3868: Dependabot (#1574) #41

A0-3868: Dependabot (#1574)

A0-3868: Dependabot (#1574) #41

Triggered via push January 15, 2024 11:27
Status Success
Total duration 7m 35s
Artifacts 2
Check vars and secrets  /  Check available vars and secrets
0s
Check vars and secrets / Check available vars and secrets
Build and push cliain  /  Build or check cliain binary
3m 55s
Build and push cliain / Build or check cliain binary
Build production node and runtime  /  Build or check liminal node
6m 33s
Build production node and runtime / Build or check liminal node
Build and push cliain  /  Build and push cliain docker image to ecr
40s
Build and push cliain / Build and push cliain docker image to ecr
Push liminal node docker image to ECR  /  Push node docker image to the ECR
23s
Push liminal node docker image to ECR / Push node docker image to the ECR
Send Slack notification about workflow status
9s
Send Slack notification about workflow status
Fit to window
Zoom out
Zoom in

Artifacts

Produced during runtime
Name Size
aleph-node-liminal Expired
32.7 MB
cliain Expired
6.63 MB