docs: clarifying development team for point estimate label descriptions #8035

Closed
wants to merge 1 commit into from
Closed
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
6 changes: 3 additions & 3 deletions CONTRIBUTING.md
Original file line number Diff line number Diff line change
Expand Up @@ -77,9 +77,9 @@ Estimates are used to determine how much work needs to go into an issue. The tot
- `estimate - 2`: Small fix or update, does not require updates to tests.
- `estimate - 3`: A day or two of work, may require changes to tests.
- `estimate - 5`: A few days of work, requires updates to tests.
- `estimate - 8`: Requires input from team, consider smaller steps.
- `estimate - 13`: Requires planning and input from team, consider smaller steps.
- `estimate - 21`: Requires planning, input from team members and possibly others.
- `estimate - 8`: Requires input from development team, consider smaller steps.
- `estimate - 13`: Requires planning and input from development team, consider smaller steps.
- `estimate - 21`: Requires planning, input from development team members and possibly others.
- `estimate - 34`: Issue should be converted into an epic. Requires all hands on deck.

### Epics