Skip to content

Project architecture upgrade #721

Project architecture upgrade

Project architecture upgrade #721

Triggered via pull request January 23, 2025 12:10
Status Failure
Total duration 5m 59s
Artifacts

build esp.yml

on: pull_request
Matrix: build_esp
Fit to window
Zoom out
Zoom in

Annotations

11 errors
build_esp (esp32s3, use_rust)
Process completed with exit code 101.
build_esp (esp32c6, use_config)
The job was canceled because "esp32s3_use_rust" failed.
build_esp (esp32c6, use_config)
The operation was canceled.
build_esp (esp32c3, use_rust)
The job was canceled because "esp32s3_use_rust" failed.
build_esp (esp32c3, use_rust)
The operation was canceled.
build_esp (esp32c3, use_config)
The job was canceled because "esp32s3_use_rust" failed.
build_esp (esp32c3, use_config)
The operation was canceled.
build_esp (esp32c6, use_rust)
The job was canceled because "esp32s3_use_rust" failed.
build_esp (esp32c6, use_rust)
The operation was canceled.
build_esp (esp32s3, use_config)
The job was canceled because "esp32s3_use_rust" failed.
build_esp (esp32s3, use_config)
The operation was canceled.