Skip to content

merge

merge #897

Triggered via schedule January 6, 2024 00:46
Status Failure
Total duration 6h 0m 28s
Artifacts

merge.yml

on: schedule
Matrix: _3-3-5
Matrix: _master
Fit to window
Zoom out
Zoom in

Annotations

22 errors
_master (dressnpcs_master, ON)
Process completed with exit code 1.
_master (dressnpcs_master, OFF)
Process completed with exit code 1.
_master (gomove_master, ON)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 360 minutes.
_master (gomove_master, ON)
The operation was canceled.
_master (gomove_master, OFF)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
_master (gomove_master, OFF)
The operation was canceled.
_master (playeritemgossip_master, OFF)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 360 minutes.
_master (playeritemgossip_master, OFF)
The operation was canceled.
_master (master, ON)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
_master (master, ON)
The operation was canceled.
_master (objscale_master, OFF)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 360 minutes.
_master (objscale_master, OFF)
The operation was canceled.
_master (playeritemgossip_master, ON)
The job running on runner GitHub Actions 13 has exceeded the maximum execution time of 360 minutes.
_master (playeritemgossip_master, ON)
The operation was canceled.
_master (multivendor_master, ON)
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 360 minutes.
_master (multivendor_master, ON)
The operation was canceled.
_master (master, OFF)
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 360 minutes.
_master (master, OFF)
The operation was canceled.
_master (objscale_master, ON)
The job running on runner GitHub Actions 11 has exceeded the maximum execution time of 360 minutes.
_master (objscale_master, ON)
The operation was canceled.
_master (multivendor_master, OFF)
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 360 minutes.
_master (multivendor_master, OFF)
The operation was canceled.