Skip to content

Ensuring that the lack of ROOT permission for the PSP on pluginUpgrad… #102

Ensuring that the lack of ROOT permission for the PSP on pluginUpgrad…

Ensuring that the lack of ROOT permission for the PSP on pluginUpgrad… #102

Triggered via push January 22, 2024 12:32
Status Failure
Total duration 53s
Artifacts
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 10 warnings
checks: packages/contracts/test/integration-testing/plugin-upgrader.ts#L377
'tx' is never reassigned. Use 'const' instead
checks
Process completed with exit code 1.
checks
Line length must be no more than 120 but current length is 124
checks
Main key parameter in mapping proposalCreators is not named
checks
Value parameter in mapping proposalCreators is not named
checks
Line length must be no more than 120 but current length is 184
checks
Avoid to use inline assembly. It is acceptable only in rare cases
checks
Avoid to use inline assembly. It is acceptable only in rare cases
checks
Line length must be no more than 120 but current length is 262
checks
Main key parameter in mapping proposals is not named
checks
Value parameter in mapping proposals is not named
checks
Line length must be no more than 120 but current length is 122