chore(deps): update dependency bazel to v8 #1736
ci.yml
on: pull_request
Matrix: integration_test_matrix
Matrix: tidy_and_test_matrix
all_ci_tests
15s
Annotations
9 errors
integration_test_matrix (ubuntu-22.04)
Canceling since a higher priority waiting request for 'Continuous Integration-410' exists
|
integration_test_matrix (ubuntu-22.04)
A task was canceled.
|
tidy_and_test_matrix (macos-15)
Canceling since a higher priority waiting request for 'Continuous Integration-410' exists
|
tidy_and_test_matrix (macos-15)
The operation was canceled.
|
integration_test_matrix (macos-15)
Canceling since a higher priority waiting request for 'Continuous Integration-410' exists
|
integration_test_matrix (macos-15)
The operation was canceled.
|
tidy_and_test_matrix (ubuntu-22.04)
Canceling since a higher priority waiting request for 'Continuous Integration-410' exists
|
tidy_and_test_matrix (ubuntu-22.04)
The operation was canceled.
|
all_ci_tests
Process completed with exit code 1.
|