Skip to content

chore(deps): update dependency bazel to v8 #1736

chore(deps): update dependency bazel to v8

chore(deps): update dependency bazel to v8 #1736

Triggered via pull request December 10, 2024 21:46
Status Cancelled
Total duration 38s
Artifacts

ci.yml

on: pull_request
Matrix: integration_test_matrix
Matrix: tidy_and_test_matrix
all_ci_tests
15s
all_ci_tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
integration_test_matrix (ubuntu-22.04)
Canceling since a higher priority waiting request for 'Continuous Integration-410' exists
integration_test_matrix (ubuntu-22.04)
A task was canceled.
tidy_and_test_matrix (macos-15)
Canceling since a higher priority waiting request for 'Continuous Integration-410' exists
tidy_and_test_matrix (macos-15)
The operation was canceled.
integration_test_matrix (macos-15)
Canceling since a higher priority waiting request for 'Continuous Integration-410' exists
integration_test_matrix (macos-15)
The operation was canceled.
tidy_and_test_matrix (ubuntu-22.04)
Canceling since a higher priority waiting request for 'Continuous Integration-410' exists
tidy_and_test_matrix (ubuntu-22.04)
The operation was canceled.
all_ci_tests
Process completed with exit code 1.