Skip to content

chore(deps): bump deps #4132

chore(deps): bump deps

chore(deps): bump deps #4132

Triggered via push October 5, 2024 20:08
Status Cancelled
Total duration 3m 39s
Artifacts

go.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (ubuntu-latest)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
build (ubuntu-latest)
The operation was canceled.
build (windows-latest)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
build (windows-latest)
The operation was canceled.
build (macos-13)
Canceling since a higher priority waiting request for 'refs/heads/master' exists
build (macos-13)
The operation was canceled.