Nightly Pipeline #102
nightly.yml
on: schedule
Matrix: build / create-runners
Matrix: build / nightly-build
Matrix: integration-test / test
integration-test
/
transformers-neuronx-container-unit-tests
8m 10s
Matrix: publish / docker-sync
publish
/
stop-aarch64-runner
5s
Annotations
6 errors
integration-test / test (TestCorrectnessNeuronx, inf2, neuron)
Process completed with exit code 1.
|
integration-test / test (TestLmiDistLora, g6, lmi)
Process completed with exit code 1.
|
integration-test / test (TestLmiDist2, g6, lmi)
Process completed with exit code 1.
|
integration-test / test (TestMultiModal, g6, lmi)
Process completed with exit code 1.
|
integration-test / test (TestNeuronxRollingBatch, inf2, neuron)
The job running on runner inf2-24380 has exceeded the maximum execution time of 120 minutes.
|
integration-test / test (TestNeuronxRollingBatch, inf2, neuron)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
test-TestAarch64-logs
|
7.78 KB |
|
test-TestCorrectnessLmiDist-logs
|
514 KB |
|
test-TestCorrectnessNeuronx-logs
|
16.3 KB |
|
test-TestCorrectnessTrtLlm-logs
|
1.41 MB |
|
test-TestCpuBoth-logs
|
21.4 KB |
|
test-TestCpuFull-logs
|
11.8 KB |
|
test-TestGpu-logs
|
1.16 MB |
|
test-TestHfHandler-logs
|
59.9 KB |
|
test-TestLmiDist1-logs
|
220 KB |
|
test-TestLmiDist2-logs
|
208 KB |
|
test-TestLmiDistLora-logs
|
248 KB |
|
test-TestLmiDistMultiNode-logs
|
17.3 KB |
|
test-TestLmiDistPipelineParallel-logs
|
145 KB |
|
test-TestMultiModal-logs
|
40.7 KB |
|
test-TestNeuronx1-logs
|
52.7 KB |
|
test-TestNeuronx2-logs
|
40.8 KB |
|
test-TestNeuronxRollingBatch-logs
|
138 KB |
|
test-TestSchedulerMultiGPU-logs
|
5.46 KB |
|
test-TestSchedulerSingleGPU-logs
|
14.2 KB |
|
test-TestTextEmbedding-logs
|
62.1 KB |
|
test-TestTrtLlmHandler1-logs
|
155 KB |
|
test-TestTrtLlmHandler2-logs
|
148 KB |
|
test-TestVllm1-logs
|
279 KB |
|
test-TestVllmLora-logs
|
273 KB |
|
transformers-neuronx--logs
|
1.49 KB |
|