Merge pull request #213 from crazy-max/switch-to-lima #576
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
test.yml
on: push
prepare-itg
2m 37s
test
1m 57s
Matrix: test-itg
Annotations
4 errors
test-itg (docker/install.test.itg.ts, macos-latest)
Canceling since a higher priority waiting request for 'test-refs/heads/main' exists
|
test-itg (docker/install.test.itg.ts, macos-latest)
The operation was canceled.
|
test-itg (docker/install.test.itg.ts, macos-13)
Canceling since a higher priority waiting request for 'test-refs/heads/main' exists
|
test-itg (docker/install.test.itg.ts, macos-13)
The operation was canceled.
|