Skip to content

Refactored clients

Refactored clients #26

Triggered via push September 12, 2024 17:14
Status Failure
Total duration 2m 24s
Artifacts

build.yml

on: push
Get minimum supported rust version
13s
Get minimum supported rust version
Matrix: E2E Tests
Matrix: SDK Tests
Matrix: WASM Tests
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Code Style
Process completed with exit code 1.
WASM Tests (1.76, false)
Process completed with exit code 101.
WASM Tests (stable, false)
The job was canceled because "_1_76_false" failed.
WASM Tests (stable, false)
The operation was canceled.
WASM Tests (nightly, true)
The job was canceled because "_1_76_false" failed.
WASM Tests (nightly, true)
The operation was canceled.
SDK Tests (stable, false)
Process completed with exit code 101.
SDK Tests (nightly, true)
The job was canceled because "stable_false" failed.
SDK Tests (nightly, true)
The operation was canceled.
SDK Tests (1.76, false)
The job was canceled because "stable_false" failed.
SDK Tests (1.76, false)
The operation was canceled.