Skip to content

upgrade to go 1.23 #1394

upgrade to go 1.23

upgrade to go 1.23 #1394

Triggered via pull request November 4, 2024 10:15
@lhy1024lhy1024
synchronize #44
upgrade-mod
Status Failure
Total duration 1m 35s
Artifacts 1

pd-tests.yaml

on: pull_request
Matrix: chunks
report-coverage
0s
report-coverage
Fit to window
Zoom out
Zoom in

Annotations

18 errors
chunks (7)
Process completed with exit code 2.
chunks (1)
The job was canceled because "_7" failed.
chunks (9)
The job was canceled because "_7" failed.
chunks (9)
The operation was canceled.
chunks (4)
The job was canceled because "_7" failed.
chunks (4)
The operation was canceled.
chunks (3)
The job was canceled because "_7" failed.
chunks (3)
The operation was canceled.
chunks (10)
The job was canceled because "_7" failed.
chunks (10)
The operation was canceled.
chunks (5)
The job was canceled because "_7" failed.
chunks (5)
The operation was canceled.
chunks (8)
The job was canceled because "_7" failed.
chunks (8)
The operation was canceled.
chunks (2)
The job was canceled because "_7" failed.
chunks (2)
The operation was canceled.
chunks (6)
The job was canceled because "_7" failed.
chunks (6)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
cover-reports-1 Expired
872 KB