Skip to content

Improve mupdf-sys docs (#106) #527

Improve mupdf-sys docs (#106)

Improve mupdf-sys docs (#106) #527

Triggered via push February 5, 2025 14:08
Status Failure
Total duration 6m 17s
Artifacts

CI.yml

on: push
Matrix: Test Suite (MSYS2)
Matrix: Test Suite
Fit to window
Zoom out
Zoom in

Annotations

13 errors
Check
Process completed with exit code 101.
Address Sanitizer
Process completed with exit code 101.
Test Suite (ubuntu-latest)
Process completed with exit code 101.
Valgrind
Process completed with exit code 101.
Test Suite (macos-latest)
Process completed with exit code 101.
Test Suite (MSYS2) (clang64, clang-x86_64)
Process completed with exit code 101.
Test Suite (MSYS2) (mingw32, i686)
The job was canceled because "clang64_clang-x86_64" failed.
Test Suite (MSYS2) (mingw32, i686)
The operation was canceled.
Test Suite (MSYS2) (ucrt64, ucrt-x86_64)
The job was canceled because "clang64_clang-x86_64" failed.
Test Suite (MSYS2) (ucrt64, ucrt-x86_64)
The operation was canceled.
Test Suite (MSYS2) (mingw64, x86_64)
The job was canceled because "clang64_clang-x86_64" failed.
Test Suite (MSYS2) (mingw64, x86_64)
The operation was canceled.
Test Suite (windows-2019)
Process completed with exit code 1.