nightly #1085
nightly.yml
on: schedule
Spec
/
Setup Test Matrix
27s
Matrix: Spec / spec
Matrix: Acceptance / acceptance
Annotations
6 errors
Acceptance / Acceptance tests (AlmaLinux-8, puppet8-nightly)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (AlmaLinux-8, puppet8-nightly)
The operation was canceled.
|
Acceptance / Acceptance tests (CentOS-8, puppet8-nightly)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (CentOS-8, puppet8-nightly)
The operation was canceled.
|
Acceptance / Acceptance tests (Rocky-8, puppet8-nightly)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (Rocky-8, puppet8-nightly)
The operation was canceled.
|