Skip to content

fix: fix slice init length #167

fix: fix slice init length

fix: fix slice init length #167

Re-run triggered October 3, 2024 19:21
Status Failure
Total duration 4m 0s
Artifacts

test-cni.yaml

on: pull_request
Matrix: integration-cni-tests
Fit to window
Zoom out
Zoom in

Annotations

6 errors
integration-cni-tests (flannel)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
integration-cni-tests (flannel)
The operation was canceled.
integration-cni-tests (weave)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
integration-cni-tests (weave)
The operation was canceled.
integration-cni-tests (calico)
The job was canceled because "flannel" failed.
integration-cni-tests (calico)
The operation was canceled.